We’ve Moved!

<img class=" wp-image-1331 alignleft" src="http://www.f-ss.com.au/wp-content/uploads/2016/11/8bddaa5e-0a01-4d2d-b708-d1beea365d12-1-300×70.jpg" alt="8bddaa5e-0a01-4d2d-b708-d1beea365d12" width="304" height="71" srcset="http://www.f-ss.com.au/wp-content/uploads/2016/11/8bddaa5e-0a01-4d2d-b708-d1beea365d12-1-300×70.jpg 300w, http://www.f-ss.com.au/wp-content/uploads/2016/11/8bddaa5e-0a01-4d2d-b708-d1beea365d12-1 .jpg 600w” sizes=”(max-width: 304px) 100vw, 304px” />FSS Head Office has moved into our new digs at Spring Hill!  As much as we loved our previous address at Brisbane Technology Park, we recognise that business is not about how fancy your office is, or what postcode you’re in… it’s about your people and how you interact with your customers.  Our staff are our business, and our new shared premises at ...

Continue Reading →
0

AS 1851 Amendment 1 Published

9f22d921-6a18-4f93-ad06-86475cc3ed72

Important News for Your Organisation: AS 1851 Amendment 1 Published

AS 1851-2012 Amendment 1 has now been published. This amendment includes important new requirements for the provision of ‘baseline data’. If your fire protection service contract is up for renewal, you need to understand what these new requirements mean for you and your business. The new Amendment can be downloaded for free from Australian Standards Online ...

Continue Reading →
0

Curtis Island LNG Program Complete

f904ab8f-dd4e-477d-a6c9-54bbe981a4a8berryjam.ru

The handover of APLNG Train 2 has heralded the effective completion of the Curtis Island LNG program.  Our client, Bechtel, has now delivered all six liquefied natural gas (LNG) production trains to three customers – QGC, Santos GLNG, and Australia Pacific LNG – on Curtis Island, off the shore of Queensland, just north of the city of Gladstone.

The three simultaneous construction programs ...

Continue Reading →
0

NOTICE OF OFFICE RELOCATION

20 JANUARY 2014ir-leasing.ru

We are pleased to advise, due to recent growth in our operations, our office relocated to Eight Mile Plains on the 20th January, 2014.

Office Address:        Ground Floor, Suite 2/12 Electronics Street, Brisbane Technology Park, EIGHT MILE PLAINS QLD 4113

Postal Address:       PO Box 274, BRISBANE MARKET QLD 4106

Continue Reading →

0

FSS working with Advantage Fire

 

<img class="alignnone wp-image-986" title="Advantage Fire substation" src="http://www.f-ss.com.au/wp-content/uploads/2013/07/Advantage-Fire-substation2 .jpg” alt=”” width=”393″ height=”291″ />

FSS have worked closely with Bechtel (Houston) and the local providers Advantage Fire and Lectrus for the past 12 months in witnessing the testing and certification for the substation buildings on the Queensland Curtis LNG Project. We understand the importance of our client’s requirements and to be able to provide field personnel in North America on short notice has been a value add to the ...

Continue Reading →
0

Barrick Gold Achieves Commercial Production

Fire & Safety Systems would like to congratulate Barrick Gold for achieving Commercial Production at its Pueblo Viejo mine in the Dominican Republic.

FSS has been involved with the Project since November 2008, and provided fire protection consultancy, design, engineering, procurement and construction services through to commissioning and handover.  FSS is continuing to provide training and operational support to Barrick and PVDC Operations.

The ...

Continue Reading →
0

First Hot Metal for Ras Al Khair Smelter

Fire & Safety Systems would like to extend its congratulations to the Alcoa Ma’aden Joint Venture on achieving first hot metal for the RAK Smelter Project! FSS is proud to have provided fire protection engineering to the project, and wishes the JV much success into operations.

FSS’ previous experience with Bechtel smelter projects (particularly in the Middle East on the Sohar and EMAL Smelters), was a key factor in our engagement to provide ...

Continue Reading →
0